Mid Tennessee TDOT Lane Closure Report March 24-30, 2021


Leveling, drainage, retaining wall construction, signaling and paving on I-24 at the EB exit to SR 254 (Bell Road, exit 59) (23.25 LM – 24.30 LM)
Leveling, drainage, retaining wall construction, signaling and paving from NB exit to SR 254 (OHB exit 74A) on I-65
Building an Intelligent Transportation System and Upgrading from Nashville to Murfreesboro (Part 2)
Use aerosol thermoplastic retro pavement markings on various highways and highways in Zone 3.
I-840 from near MM 8 to surface east of the Liepers Creek Rd flyover. Including dismantling of the end cover of the bridge and repair of expansion joints.
Use aerosol thermoplastic retro pavement markings on various highways and highways in Zone 3. mm 24.5 – 32.5
Full and partial deep restoration of Portland cement concrete pavement and pavement on US 41 (US 70S, SR 1 Murfreesboro Rd.) near Fesslers Ln. (LM 20) to Foster Avenue.
SR 112 (US 41A/Clarksville Pike) 从 SR 12 (Ashland City Highway) 到 SR 155 (Briley Pkwy.) – Piedmont, go to
Includes: Grading, drainage, welded steel beam bridges, retaining walls and paving for SR 149 and SR 13 from River Road to Zinc Plant Road. mm 17-19
Leveling, drainage, construction, signaling, and paving of two concrete T-beam onion bridges from SR 102 (LM 5.0) to SR 266 (Jefferson Pike) east of I-840 (LM 9).
SUMNER County, Local Program SR 174: Goodlettsville Traffic Flow Improvement and Traffic Light Upgrades
Grading, drainage and paving SR 6 (Franklin Road) south from Moores Lane (15.93 LM) to Concord Road (18.53) – (15.93–18.53 mm)
Profiling, drainage, bridge and signalization construction on SR 96 east of Arno Rd (LM 14.72) to SR 252 (Wilson Pk) (LM 20.62).
March 26, 9:00 a.m. to 3:00 p.m., single, WB closes right lane from Nolensville Rd to Harding Place. on Jonkill Road. For milling and paving. TDOT Maintenance – workflow management.
Motorists are advised to exercise caution and obey speed limits in all TDOT operating areas, regardless of lane closure activity. The information in this report was provided to the Department of Transportation by a contractor. Most jobs are weather dependent and subject to change due to severe weather.
Get information about the latest construction work and broadcast streams from SmartWay traffic cameras at www.TNSmartWay.com/Traffic from your desktop or mobile device. Travelers can also dial 511 from any landline or mobile phone for travel information or follow us on Twitter at www.twitter.com/TN511 for statewide travel updates.
As always, drivers are being reminded to use all information tools to drive wisely and know before they drive! Check travel conditions before heading to your destination. Drivers should not use their phone to tweet, text or chat while driving.

WhatsApp Online Chat !